2024 Conference Presentations

Final Breakout Matrix

General Sessions
1. Improve I-70
2. Ignore the Impossible
3. MoDOT Update

1 – Heidelberg
1A Idaho I-86/I-15 System Interchange – Bi Directional Load Test of Drilled Shafts Bearing in Granular Soils: Construction Lessons Learned
1B A Simple Span Bridge That Wasn’t Simple
2A MacArthur Railroad Bridge West Approach Span Replacement in Downtown St. Louis Using Accelerated Construction
2B Increasing Project Efficiency: MoDOT’s Pre-1945 Common Bridge Programmatic Agreement
3A Houbolt Road Bridge over Des Plaines River Public/Private Partnership: Non-Traditional Procurement and Non-Traditional Solutions
3B Jefferson Barracks Bridge – A Case for Rehabilitation
4A 3D Technology Solutions in Construction
4B Design and Construction of Route 86 over Table Rock Lake
5A Cost-Effective Bridge Replacement and Rehabilitation Solutions
5B Emergency Bridge Repairs

2- Barcelona-Madrid
1A Navigating the Grant Funding Process? Do this Before Applying and After being Awarded
1B How Would You Like to Increase the Life of Your Asphalt Roads by 30 Years or More?
2A The Future of Asphalt Paving – Balance Mix Design & Intelligent Compaction
2B I-44 Resurfacing, Reconstruction and Bridge Rehabilitation in Crawford & Phelps Counties
3A Sherlock-Hydro: Unlocking Hydrologic Secrets Using Rain-On-Mesh Models
3B MoDOT’s Transition to OpenRoads Designer – The Consultant’s View
4A Plugging a 60-Year-Old Hole in the Highway Capacity Manual: Arterial Weaving
4B How Artificial Intelligence is Transforming Transportation Asset Evaluation and Management
5A NEPA Re-evaluation of I-70 SIU 4 EIS for Design-Build Delivery
5B Introduction to Litigation: preparation for Deposition and Courtroom Testimony

3- Innsbruck
1A MoDOT’s Design-Build Program Update
1B Buck O’Neil DB Project: Construction Updates & Unique Challenges
2A Lake Season Holiday Traffic Impacts to Capacity Planning
2B Route D Road Safety Audit – The Assessment and the Opportunities
3A Moving Millions of People – Silver Dollar City Entry Improvements
3B Work Zone Watch
4A Railroad Crossing Safety Improvement Program
4B Navigating Construction Challenges When Nothing is Going According to Plan
5A I-64 at 22nd Street Interchange – A New Gateway (Pt. 1)
5B I-64 at 22nd Street Interchange – A New Gateway (Pt. 2)

4- Milan-Venice
1A Kansas Avenue Streetscape & Cycle Track
1B Transforming a Pedestrian Underpass Into a Welcoming Attraction
2A DeSoto Progressive Design Build – Another Tool in the Alternative Delivery Toolbox
2B 69 Express Procurement and Program Management Project Delivery
3A I-55 Corridor Design-Build Project – Maximizing Reliability and Safety on Interstate 55
3B US 412 in the Bootheel – Evaluation of Alternate Design Templates
4A Improve I-70: The Crystal Ball of Core Sampling
4B ADA Public Right-of-Way Accessibility Guidelines (PROWAG) Update
5A Project Home Run – Evaluating New Potential Homes for the Royals
5B Earthquake Response Tools for Transportation